Inspectionirific!
Exciting news: we passed our close-in inspections day-before-yesterday! It was a huge push, but I managed to finish the plumbing (both DWV and supply), gas (which required a ton of fixing what the plumber was supposed to have done), electrical (I racked, stapled, and organized a million wires that the electrician left - both figuratively and literally - dangling), and got all the low voltage (CAT-6 and cable) tucked in and complete.
Only thing that didn't pass was the framing - due to some missing blocking on the staircase. I'll get that done this weekend and have the insulation guys in next week! Excitement-city: we should be drywalled by the end of the month!
Only thing that didn't pass was the framing - due to some missing blocking on the staircase. I'll get that done this weekend and have the insulation guys in next week! Excitement-city: we should be drywalled by the end of the month!